Thursday, July 28, 2011
impregnat for capuccino
Could you please read this and tell me:
- How many coats do we need to put on?
- Can we put it on after we point?
- How many hours do we need to wait after before we can work?
Wednesday, July 27, 2011
water filters problem
The water filters that you sent are different sizes as you can see on the boxes. 2 are ¾” and the other is 1” . Adam needs all of them to be 1” because otherwise we will have a problem with the water supply not being strong enough for the whole house. This is because we are installing in the service room rather than under the sinks alone. In the service room the full necessity in water for all the house (kitchens, showers, Washing machines etc., )will need to go through the filter and as a result it is a problem to be ¾”. Please bring with you 2 1”filters and Adam will install them.
Tuesday, July 26, 2011
areas to be cleared of building materials
All the material from the building will be removed but the area will most probably not be further developed. There is a small chance that we will have the time to build the concrete lining that will bring the level up quite significantly and then all the general left overs- not concrete and plastic - will be used as infill.
Subscribe to:
Posts (Atom)